Fabrication: Day 19

This morning we had to make adjustments to the length of spacers used on the installed panels. Once the correct length was determined, we purchased the necessary material and the panel installation was able to move forward. We were able to install the majority of the panels, with only the top and bottom rows remaining. A special thanks to Troy and Adrian for coming to weld the tower foundation gusset plates and the gravel trim piece and to Dan for bringing the team beer!