Fabrication: Day 12

Today we made a few minor adjustments to the steel frame to finalize the connection between the top and bottom; now the tower structure is fully assembled and welded. The glass is now ready to be ordered after the glass template was adjusted based on the opening of the assembled beecab. The bee-boards that will be used to divide the space of the beecab and to provide an adequate surface for hive formations were cut and installed. Other pieces of the mechanical system, including a locking mechanism for the beecab winch, were fabricated.