Foundation: Day 6

Today was foundation day! First Jim and some men on site (Hector) helped us dig a large hole.  We used a bobcat and a forklift to rip up some bricks, railroad ties, rocks and other fun stuff underground.  After a large hole was in place the formwork was set.  An auger was used to dig four 12 inch diameter holes about 30 inches deep.  The entire formwork was leveled for the foundation to be poured next week.  Another successful day!  Thanks to everyone who helped out!